Raising a change

↩ Change Management

Select Changes (under Operations), then New change.

What to fill in

FieldWhy it matters
Title and descriptionWhat you intend to do.
TypeChosen from the change types your organisation has defined — some skip approval entirely. See Change advisory boards and change types.
Risk, impact, priorityYour own assessment. These feed the risk score but are not the whole of it.
AssigneeWho is doing the work. Approval cannot start without one.
Affected itemsThe sites, devices, servers and services this touches.
Scheduled windowStart and end. Leave it out and the change is unscheduled.
Causes an outageWhether the work takes something down.
Implementation planHow you'll do it.
Rollback planHow you'll undo it. Required before approval on high-risk changes and anything taking an outage.

Affected items do more than describe

It's tempting to skip affected items on a small change. Don't — they drive three things that only work if the list is filled in:

  • Blast radius — what this change can take down.
  • Collision detection — whether another change is already booked against the same things in the same window.
  • Impacted contacts — who to tell, drawn from the ownership and stakeholder records of the items you named.

A change with no affected items has no blast radius, so nothing can warn you about it.

The changes page

The left rail holds saved views:

  • Active changes — everything in flight
  • Awaiting approval — blocked, waiting on a decision
  • Running now — currently inside its implementation window
  • Causing outage — flagged as taking something down
  • Unscheduled — no window booked
  • Window collisions — overlapping another change on shared items

Above the list, a KPI strip summarises the same picture, and a next seven days calendar shows what's booked, marking overlaps.

Working from an existing change

  • Duplicate copies a change you've run before — useful for recurring work.
  • Similar past changes surfaces comparable changes and how they went. A change like one that succeeded before scores slightly lower risk.

Notes & tips

  • Fill in the rollback plan early. It lowers the risk score immediately, and on a high-risk change it's required before approval can start.
  • Unscheduled changes don't appear on the calendar, so nobody can see them coming. Book a window as soon as you know it.